Active Transport Superhighway - Sydney / Newcastle / Wollongong

Base map

The network

4,000 kmContinuous pathNo dead ends. No sharing space with cars. No space taken from motorists.
1,500 kmBuilt alreadyFully-separated MUP that's good to go as is.
2,400 kmGround that just needs designation. No construction required.
100 kmPath that needs actual material constructionTo unlock the whole 4,000 km
2/3 peopleLive within 500 meters
90%People live within 1 km
1,100Playgrounds on route
1,500Public toilets within 100 metres
Every schoolAll 2,000 to be directly connectedSkip the pain of the drop-off queue altogether.

Network layers

Note - Classifications of routes are occasionally too complex to be communicated with one colour here. Many Waterway and Trainline routes are already Existing Bike Paths, for example, and some of the category called Existing Bike Paths may be currently rideable but not designated as such. Consider it all one big Green Line.

10 Key Segments

What it looks like on the ground:

Proposed route line markingProposed route line marking
A solid Green Line, to mark the edge of the path, and a Coloured Line inside of that, to mark what that section is following. The Green lines are completely continuous, in both directions. They always connect to another piece of the network.
▶
Sydney. Connected. - 40 second overview. Click to play.
EveryoneDeserves access to safe, clean, comfortable, affordable transport

Find a segment

Places

Context layers

Cost

ProjectCostLengthCost per Metre
WestConnex$25 billion25 km$1M
Metro$60 billion113 km$550k
Light Rail$11 billion46 km$250k
Active Transport Superhighway$2 billion4,000 km$500
Active Transport Superhighway

    Photo gallery